Structural Erection Planning
Structural erection planning decides the order in which a frame goes together before a single member leaves the lay-down. We map the erection sequence to the footing, the anchor bolt layout and the temporary bracing plan so that steel and timber rise in a stable rhythm rather than a series of improvisations. For every bay we set a sequence number, a target crew and a window, and we cross those against the delivery schedule so the column that lands first is the column the drawings want first.
The plan also forecasts the awkward moments, such as the point where a frame is most exposed before permanent bracing arrives. By pre-planning temporary guying and by choosing a sequence that never leaves a tall member standing for long without support, we shrink the risky middle of an erection. The result is a predictable daily pace, a stable structure all the way up and a sequence every foreman on site can read from the same page.